Project Location:
Alamo Community Colleges-Palo Alto Campus
Client: Alamo Colleges
Completed: 04/2002
Project Type:
Institutional
Services Performed:
General Contracting
Mechanical Contracting
Frost & Keeling served as the Self Performing Prime Contractor for the HVAC upgrades at the Palo Alto College Natatorium. The project consisted of providing dried and conditioned air to the Olympic indoor swimming pool. Or scope included providing two new 50,000 cfm air handling units and installing a new stainless steel duct system ranging in size up to 68”. The provided air conditioners had built in heat recovery capability which was used to assist in heating of the swimming pool.