HVAC Upgrades at Palo Alto College Natatorium

Project Location:

Alamo Community Colleges-Palo Alto Campus

Client: Alamo Colleges

Completed: 04/2002

Project Type:

Institutional

Services Performed:

General Contracting

Mechanical Contracting

 

Frost & Keeling served as the Self Performing Prime Contractor for the HVAC upgrades at the Palo Alto College Natatorium. The project consisted of providing dried and conditioned air to the Olympic indoor swimming pool. Or scope included providing two new 50,000 cfm air handling units and installing a new stainless steel duct system ranging in size up to 68”. The provided air conditioners had built in heat recovery capability which was used to assist in heating of the swimming pool.